Haiku Road Culvert
This project includes replacing a portion of the existing Haiku Road culvert, repairing the existing embankment, construction of new embankments, outlets headwall, grated inlet, 18” drain line, energy dissipater basin, concrete outlet transition, and vehicular access road, repave the existing roadway, install guardrails and provide other improvements incidental to the project.
Haiku Road Culvert

Kaholopo’o Bridge Replacement
Project includes demolition of the existing bridge and associated structures; constructing the Replacement Bridge, and guard walls; reconstructing pavement areas; installation of signs, pavement markers, striping and all other incidental work necessary to complete the bridge project.
Kaholopo’o Bridge Replacement

Kamehameha and Hina Avenue Pavement Rehab
The project includes rehabilitation of the Kamehameha Avenue Pavement Structure from Puunene Avenue to Papa Avenue and Hina Avenue pavement structure from Wakea Avenue to Niihau Street and Molokai Akau Street to Ani Street with Asphalt Concrete, Hot Mix Asphalt Base, and Aggregate Sub base section; replacement/reconstruction of concrete sidewalks and concrete curbs; installation of pavement striping and markers; and other incidental items.
Kamehameha and Hina Avenue Pavement Rehab

Kamehameha Ave/Kane Street Improvements
This project involves the installation of new traffic signal system and modifying existing roadway. Construction work includes furnishing and installing signal poles, vehicle signals, pedestrian signals, pullboxes, conduits, detectors, preemption devices, controller assembly, sidewalks, sign and markings, removal of existing striping and pavement markers, installing striping and pavement markers.
Kamehameha Ave/Kane Street Improvements

Lahaina Watershed Phase 3A
The project involves the construction of a diversion channel (grassed) with an approximate length of 550 ft., a bottom width of 65 ft., depth of approximatly 14.0 ft – 15.5 ft., and side slopes of 2.5 horizontal to 1 vertical. It will also include the construction of a pre-cast concrete arch culvert crossing consisting of two (2) 20’x8’ and one (1) 32’x8’ spans with concrete slab and 4 ft. tall concrete pedestals, concrete headwalls and C.R.M wingwalls, relocation and reconstruction of an existing drainage structure, permanent irrigation system, new roadway pavement, guardrails, signs and pavement markings.
Lahaina Watershed Phase 3A

Molokai/Lanai District Resurfacing
This project involves cold-planning the existing pavement section of various roadways; overlaying with a new asphalt concrete pavement section; installing pavement markings; adjusting manhole frames and covers, as needed; adjusting centerline monuments, as needed; and all other incidental work necessary to complete the project.
Molokai/Lanai District Resurfacing

Upcountry District Resurfacing
The project involves cold planning and resurfacing Hapapa Road, Holopuni Road and portion of Ka Drive, all located in Kula. The scope of work includes removal of obstructions; road pavement work; adjusting manholes and water valves; preserving street survey monuments and centerline monuments; pavement striping and markers; and other incidental items.
Upcountry District Resurfacing

Wakea Avenue Pavement Rehabilitation
The project includes rehabilitation of Wakea Avenue from Kaahumanu Avenue to Puunene Avenue with Asphalt Concrete, Hot Mix Asphalt Base and Aggregate Subbase section; replacement/reconstruction of concrete sidewalks and concrete curbs; installation of pavement striping and markers; and other incidental items.
Wakea Avenue Pavement Rehabilitation

Wells Street and Wakea Avenue Reconstruction
This project includes pavement reconstruction of Wells Street from High Street to Waiale Road and Wakea Avenue from Puunene Avenue to Hana Highway with Asphalt Concrete, Hot Mix Asphalt Base and Aggregate Subbase section; replacement/reconstruction of concrete sidewalks and concrete curbs; installation of pavement striping and markers; and other incidental items.
Wells Street and Wakea Avenue Reconstruction

Wells Street Sidewalk Improvements
Construction of new concrete sidewalk, concrete curbs, and concrete ramp; Reconstruction of Asphalt Concrete Pavement along the new sidewalks; Installation of roadway pavement striping; Reconstruction of asphalt concrete parking lot; Installation of parking lot pavement striping; and other incidental items.