Lower Main Street Reconstruction (Mill Street to Hala Place)
Scope of Work
The project involves pavement reconstruction of Lower Main Street between Mill Street and Hala Place with an asphalt concrete and asphalt treated base pavement section. The scope of work includes removal of obstructions; road pavement work; adjusting manholes and water valves; preserving street survey monuments and centerline monuments; replacing traffic loop detectors; pavement striping and markers; and other incidental items.
(MAP)

Other Pertinent Information
There will be lane closures-Please follow traffic safety signs and drive carefully. Traffic will be one way during Paving Operations(4/6/13-4/7/13 or 4/13/13-4/14/13).  For all other construction activity traffic will be contra flowed.

When
Contract Working Days: 100
NTP (Notice to Proceed) – April 1, 2013
Completion Date - August 22, 2013

Streets Involved
Lower Main Street Reconstruction (Mill Street to Hala Place)

Contractor
Maui Paving LLC
PO Box 78
Honolulu, HI 96810

Contract Cost
$568,235.00

Project Contact 
DPW Engineering Division (808)270-7745